September 2014 - Valley station
ISCHGL
![](/_default_upload_bucket/95030/image-thumb__95030__hero/63783-2014-09-19-19-31-39-244.jpg 1x, /_default_upload_bucket/95030/image-thumb__95030__hero/63783-2014-09-19-19-31-39-244@2x.jpg 2x)
![](/_default_upload_bucket/95030/image-thumb__95030__hero/63783-2014-09-19-19-31-39-244.jpg)
Work at the valley station of the 3-S Pardatschgrat in September
- concrete work in the infrastructure section
- assembly of the rolling stock
- teardown of the old ski bridge
- roof sealing work in the cable car section
- work at the glass facade
- start of the ropeway technical initial operation
- interior construction of the infrastructure section
- Assembly of the ski bridge at the station platform level
More posts
0
Interested?
Suggested entries
read more